EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
SpiritOfMudsuck
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (686)
Avionics
- (33)
Cockpit
- (33)
Controls
- (69)
Cowling
- (29)
Documents
- (5)
Empennage
- (105)
Engine
- (78)
Ext. Finish
- (34)
Firewall Forward
- (14)
Fuel System
- (6)
Fuselage
- (14)
Hangar
- (106)
-
Rent
-
Rent
-
Rent
-
Rent
-
Rent
-
Organize & Prep
-
Raw material hangers
-
Hang Lights
-
Rent
-
Rent
-
Air Compressor
-
Rent
-
Rent
-
Move Workbench
-
Organize Space
-
Pickup and Deliver...
-
Level Flooring
-
Spread rock floor
-
Add stone to floor
-
Remove Impediments
-
Monthly rent
-
Evaluate and Clean...
-
Monthly rent
-
Monthly rent
-
Prep cradle for...
-
Packing and prep for...
-
Additional work on...
-
Wing Cradle Inspection
-
Clean and Collect
-
More platform recovery
-
Lumber recycle
-
Disassemble last of...
-
Recover 2x6s
-
Packing up
-
Prep for Move
-
Clean and Pack
-
More organization...
-
Organize and store...
-
Pack and Move Parts
-
Clean Up, Organize,...
-
Cleanup prep for Paint
-
Yearly Hangar Rental
-
Reorganize Storage
-
Hangar Cleanup
-
Refuse disposal
-
Hangar rent Sep 2020...
-
Repair Canvas Tear
-
Repair Roof Leak
-
Tighten/replace...
-
Cleanup
-
Repair Door...
-
Drainage
-
Additional Work Light
-
Set Drain Line
-
Placed drainage pipe
-
Clear Drainage
-
Replace Canvas Door...
-
Repair Torn Grommets
-
Divert Rain Water...
-
Paint and Hang Sign
-
Layout Hangar Sign
-
Front Wall Sign/rent
-
Drainage Ditch
-
Illuminated Exit Sign
-
Seal Roof
-
Chemical Weeding
-
Brush Cutting
-
Door Maintenance
-
Door Repair, APRS
-
Door Repair
-
Sliding Hangar Door
-
Roof Maintenance
-
Drainage and...
-
Hang Shop Lights
-
Install Shop Lights
-
Wire Outlets, Hang...
-
Power Conduit
-
Platform,...
-
Canvas Door Hangers
-
Work Platform...
-
Prep for Work...
-
Door Lockset &...
-
Install Entry Door
-
Entry Door Framing
-
Soft Door Hanger
-
Side Door Prep
-
Hang Right Side Door
-
Canvas Door...
-
Right-side Hangar Door
-
Wiring & Curtain...
-
Interior Conduit...
-
Prep For Hagar Door...
-
Prep for AEP Power...
-
Electrical...
-
Electrical...
-
Electrical Inspection
-
Grounding, Place Outlet
-
Pull Service Wires...
-
Underlayment and...
-
Rehabilitate Roofing
-
Strip Metal Sheeting...
-
Electrical Power...
-
Electrical Power...
-
Build work platform
-
Clean hanger space
-
Evaluation &...
Interior Finish
- (6)
Instrument Panel
- (72)
Inspection
- (2)
Landing Gear
- (6)
Propeller
Radios
- (8)
Research
- (21)
Tools
- (11)
Wings
- (34)
Builder Name:
Pete Dailey
-
Project:
Sonex - Xenos-B Motorglider
-
VIEW REPORTS
Total Hours:
1506.3
Total Flight Time:
Total Expense:
$75148.03
Start/Last Date:
Jul 01, 2016 - No Finish Date
Engine:
Aerovee 2.1 Turbo
Propeller:
Sensenich
Panel:
MGL Avionics Explorer iEFIS/ECB/RDAC
Friendly URL:
https://eaabuilderslog.org?s=SpiritOfMudsuck
Home or Last Project Picture
Oct 04, 2023
Hang Lights
- (3.2 hours)
Category: Hangar
Hung shop lights, determined details for rear wall tarp.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.